logo
  • sitemap
  • Sitemap
  • HOME
  • ABOUT US
    • Company Profile
    • Vision
    • State of Art Equipment
    • Corporate Structure
  • SERVICES
    • Geo Tec Specialization
      • Foundation Engineering
        • Diaphragm Wall
        • Bored Piling
        • Secant Piling
        • Micro Piling
        • King Post
        • Soldier Piling
        • Sheet Piling
      • Ground Improvement
        • Jet Grouting
        • TAM Grouting
        • Permeation Grouting
        • Compaction Grouting
        • Cavity Grouting
        • Chemical Grouting
      • Slope Stabilization/Deep Excavation
        • Ground Anchors
        • Pile Anchors
        • Soil Nails
        • Rock Anchors
        • Rock Bolt
        • Shortcrete
      • Cut-Off Walls
    • Tunnels
      • Micro Tunneling
      • NATM Tunneling
      • Drill and Blast
    • Hydro-Power
    • Port
  • PROJECTS
    • On Going Projects
      • Jet Grouting Works
        • Hydro Electric, Teesta
        • Cross Passages Works, Chennai Metro
      • Piling Works
        • Thermal Power Works
        • Bangalore Metro Project
      • Diaphragm Wall
        • D-Wall, Chennai Metro
      • Slope Stabilization
        • Hydro Electric, Teesta
        • Hydro Electric, Sikkim
        • Flood Protection, Kollidam
      • Road Over Bridge
        • R.O.B, LC-74
        • R.O.B, LC 101-101A
      • Soil Consolidation Works
        • Permeation Grouting, Koldam
        • TAM Grouting, Punatsangchhu-I
      • Tunnel
        • NATM Tunnel, Banihal
      • Anchors Works
        • Hydro Electric, Teesta
      • Cut and Cover
        • Cut & Cover BR-4, Banihal
        • Cut & Cover 144B-144C, Banihal
        • Cut & Cover BR-8, Banihal
    • Completed Projects
  • INVESTOR RELATIONS
  • CAREERS
  • CONTACT US

Services

Foundation Engineering
  • Diaphragm Wall
  • Bored Piling
  • Secant Piling
  • Micro Piling
  • King Post
  • Soldier Piling
  • Sheet Piling
Ground Improvement
  • Jet Grouting
  • TAM Grouting
  • Permeation Grouting
  • Compaction Grouting
  • Cavity Grouting
  • Chemical Grouting
Slope Stabilization/Deep Excavation
  • Ground Anchors
  • Pile Anchors
  • Soil Nails
  • Rock Anchors
  • Rock Bolt
  • Shortcrete
Tunnels
  • Micro Tunneling
  • NATM Tunneling
  • Drill and Blast

Punjab Piling

Concrete Piling Works for 2x270 MW TPS at Goindwal sahib, Tarn Taran District, Punjab


No of Piles completed :

4300 nos

Depth of Each Column :

26 mtr

Loading image. Please wait

Geo Technical Specialised Works

    Foundation Engineering

  • Secant Piling
  • Bored Piling
  • Soldier Piling
  • Sheet Piling
  • Micro Piling
  • King Post
  • Diaphragm Wall

    Ground Improvement

  • Jet Grouting
  • Permeation Grouting
  • Chemical Grouting
  • TAM Grouting
  • Compaction Grouting
  • Cavity Grouting

    Slope Stabilitation

  • Ground Anchors
  • Pile Anchors
  • Soil Nails
  • Rock Anchors
  • Rock Bolt
  • Short Crete

    Other Specialised Works

  • Cut & Cover
  • Cross Passenge
  • Pipe Roofing
  • Trussel Brg
  • Guide Wall
  • Quality Control
  • Core Sampling

© Copyright 2013 BUMI. All rights reserved

Designed by ImagiNET Ventures