Teesta Slope Stabilization
Completed qty as on 20.10.11 |
|
|
Excavation | : | 54000 cum |
Pile/Ground Anchors | : | 1798 Nos |
Bore Pile of 800 mm dia | : | 653 Nos of depth 25 mtr |
Shotcrete | : | 3800 sqm |
Drain Hole | : | 500 Nos |
Inclinometer has been installed in three places into the Slope in order to record and find out the Slope movements.
Narration:
Stabilizing the slope on left and right banks along the teesta river at stage VI, by
1. Shotcreting
2. Bored piles
3. Installation of Ground anchor, Pile anchor
Right Bank:
Height | : | 30.7 mtr (From Elevation 365 to 334.3) |
Length | : | 380 mtr (RD 30 to 410) |
Left Bank:
Height | : | 35 mtr (From Elevation 365 to 330) |
Length | : | 420 mtr (From RD -60 to 360) |